China Cold Extrusion Al Flange With CNC Postprocessing For Car Air Conditioning System
Product Name | Flange |
Manufacture Process | Design-Cold extrusion-CNC machining-Inspecting-Packing |
Main Material | Al 6082-T6 |
Production Equipment | 1) Cold extrusion machine2) CNC machine |
Processing time per piece: | 2 hours |
Measuring Instruments and Equipment | 1) Micrometer2) Smooth plug gauge
3) Thread gauge 4) Image measuring instrument 5) Coordinate Measuring Machine 6) Roughness tester 7) Routine inspection of calipers |
Tolerance | ± 0.01~0.05 mm |
Quality control | ISO 9001:2008 & IATF 16949 |
Sample time | 1-3 days |
FAQ | Q: Can you do customized design and size?A: Yes, ODM & OEM are available.
Q: Can I have some samples? A: Of course, stock samples are free. Lead time: 2-3 days. Customized samples: about 7-10 days.
Q: How long is your production lead time? A: The goods will be finished within 20-30 days after sample confirmed. Q: What is your MOQ? A: Our MOQ is 5000-10,000pcs.
Q: Which payment way is workable? A: Small amount: PayPal, Western Union, Cash. Large amount: T/T, Escrow, L/C, DP and OA.
Q: How is your after sales service? A: 1. Your comments and feedback are important to us; 2. If any damage or defect goods you found, after necessary checking, if it's our fault, we will take full responsibility to compensate the loss. |
Certification